22-05-2021, 11:06 AM
Hi.
I got a sneaky half hour this morning.
I can confirm the line stage is operating and there is a good pulse at the EHT rectifier anode cap. No EHT but likely to be the valve or the 4 ohm series resistor on the heaters. Ran out of time so Monday before I can resume work.
Looking good so far.
I got a sneaky half hour this morning.
I can confirm the line stage is operating and there is a good pulse at the EHT rectifier anode cap. No EHT but likely to be the valve or the 4 ohm series resistor on the heaters. Ran out of time so Monday before I can resume work.
Looking good so far.






