11-07-2017, 12:17 PM
(11-07-2017, 04:59 AM)Synchrodyne Wrote: From there it is not a major leap to suggest that in perpetuating the live chassis technique for receivers that were only for operation on AC power supplies, the setmakers were to some extent treating their customers with contempt in respect of safety. ... For example, a good write-up in “Which” that in conclusion came out against live-chassis receivers might have stirred things up a bit!
Treating their customers with contempt in respect of safety???
Provided the sets complied with safety standards such as BS415, how could the customers' safety be compromised? The customer wasn't supposed to remove the back and there would be no reason for Which? to investigate or comment on the internal design - they were purely concerned with performance and even refused to take cost into account. Thus they would rubbish a perfectly good product (of any type) because it didn't perform quite as well as one costing twice as much!
One case in point was the Bush TV123 which was an economy version of the TV125 in a plastic cabinet with a rotary UHF tuner rather than push button (but otherwise identical internally) which was rubbished on the basis that the sound quality wasn't as good (because of the plastic cabinet!) than its more expensive brother with the wooden cabinet!
Similarly, although much later, a (very) cheap electric kettle we bought several years ago - and still going strong - was rubbished by Which? because their sample didn't switch off until seven seconds after the water boiled! I've just done a quick calculation and, assuming we use it twice a day, it has consumed extra power totalling a fraction under 1 unit a year, every year. However, by the time we bought that kettle, Which? had got so ridiculous that we cancelled our subscription - so you could say that Which? has actually saved us a small fortune over the years!
Of course it was the service personnel who had to take care when working on those AC/DC sets which reminds me of when our shop was extended and a new workshop guilt shortly after I started work. Everything was virtually complete and waiting for the Electricity Board to turn up and connect the feed to the new consumer unit into the supply. The feed ran behind the original building line to feed us and the adjacent properties and now ran though a hole which had been left in the new concrete floor at the back of the shop.
So this chap turned up and spread out a rubber mat on the edge of the hole and merrily spliced the two cables together while we all looked on with admiration thinking 'blow that for a game of soldiers' or similar! When he'd gone, of course, we went back to the workshop and continued to manhandle large chunks of metal connected directly to the mains without a care in the world and not a rubber mat in sight!






