11-04-2017, 02:43 PM
Let me understand the time sequence here:
1. You had it working, basically
2. You ordered high voltage caps from Mouser
3. You have not yet installed them (I forget why you thought you needed to do this....)
4. You applied power to the scope before doing anything at all after item 1 above
5. R926 burnt
6. You removed P126, which was a 2-pin and a 3-pin connector side by side - without noting what went back where? I always, without fail do this, usually using my phone to close up photograph.
Does that about sum up where you are?
1. You had it working, basically
2. You ordered high voltage caps from Mouser
3. You have not yet installed them (I forget why you thought you needed to do this....)
4. You applied power to the scope before doing anything at all after item 1 above
5. R926 burnt
6. You removed P126, which was a 2-pin and a 3-pin connector side by side - without noting what went back where? I always, without fail do this, usually using my phone to close up photograph.
Does that about sum up where you are?







