24-08-2013, 01:21 PM
My design was similar to this but I also designed a separate hook up bogie arch to lift the rear of 24 ft sticks so as to cut down on journey times when 12 ft sawlogs were needed at the landing point ie: process the logs lengths to 12 ft at the landing point rather than at stump.
https://www.youtube.com/watch?v=MrihoJHZyeM
Lawrence.
https://www.youtube.com/watch?v=MrihoJHZyeM
Lawrence.







